Gallery - 25 September 2017 ---
Checking for updates. Please wait - won't be long!
- 25 Sep, 2017 -- Friday afternoon panic the usual JW & I draw the short straw got to get this pot to Big Harries before the curfew kicks in Wide & High pest jobs .TC
- 25 Sep, 2017 -- There are days when we just play trains with the mob from Richmond Vale always dramers as it involved backing down a bent alley way to hook up to their rail lines after they added another 5 Mtrs of rail between the float & their siding ramp so they can tow the loco off as usual tests the drivers skills with the dolly in .break up the rig close the dolly & load the dolly usualy in the dark this day we did it twice before the sun went down .TC
- 25 Sep, 2017 -- 2 heat exchangers on a Sunday morning from Islington to the Slipways for the Auror Australis where no heat generated on board ship was allowed to escape till it was used for many things on board this move had many folks involved for wires were taken down & replaced many hours & police sending traffic all over the back streets as we took Maitland road over for most of the day great to see the ship taking shape from all the modules we were moving into the site as required after the Wartzilla V16 &V12 engines were fitted the pipe work was amazing to see before these 2 heat exchangers were sat on top of the power units .Hayters hauled most of the bits in as required for the build great jobs .TC